Minor Transmission Projects

Creekview Remote End Work: Designed the installation of OPGW, a new line relay panel, and a new communications cabinet. Coordinated with the client about scope changes and the progress of the project. Performed a DC battery calculation on the existing battery system and determined that it was sufficient to accommodate the additional loads from the project.

Replace Line 80332 Relays: Designed the installation of a new line relay panel, communications panel, bus-tie breaker panel, and converting an existing panel into an remote terminal unit (RTU) panel. Coordinated with the client about panel wiring, project progress, and remote substation challenges.

Mullet River to Sheboygan Energy Center Optical Ground Wire (OPGW) Installation: Designedthe installation of OPGW at two remote substations as a part of the Mullet River to Sheboygan Energy Center project. Coordinated with the client to re-route the path of the OPGW effectively between the three substations.

Fitzgerald Remote Ends Optical Ground Wire (OPGW) Installation: Designed the installation ofOPGW at two remote substations as a part of the Fitzgerald SS project. Oversaw the drafting team to ensure that the new CAD standard from the client was used correctly.

Substation Security Enhancement Project: Upgraded three substations to meet the new NERC CIP-014 Physical Security standard. Designed on a tight schedule and this included communications design, SCADA design, and frequent communication with the client.

Sunset Point: Performed a DC battery calculation to ensure that the battery load could handle the additional load. The calculation determined that the current battery system was sufficient with the additional load.

Wolcott Substation – 230 kV - 2 Shunt Reactor Bay Addition & Ring Bus Breaker Replacement

  • Lead Substation Engineer

Hawks Nest Lake Substation – Green Field 345 kV Wind Farm Interconnect

  • Lead Substation Engineer

Jordan Substation – 69 kV 3 Breaker Addition & 69 -12.5 kV Transformer replacement

  • Lead Substation Engineer

Hidalgo Substation – Green Field 345 kV Wind Farm Collector Substation

  • Substation Engineer

Reynolds Substation – Green Field 765 kV MVP Substation

  • Owner’s Engineer - Specification & Bid Analysis Work

Peace Garden Substation – Green Field 230 kV Wind Farm Interconnect